Project Manager: 
Simon Dobson
Project Location: 
Cambourne
Project Budget: 
£190,000
preview_images: 
slider_image: 
slider_text: 
Cambourne Village College
case_body: 

Customer Brief:

 

Cambourne Village College is the first new school to be built in Cambridge for decades. Papworth Furniture Ltd was appointed by the Main Contractors, Kier Construction Ltd, to manufacture and install all the fixed furniture throughout the college.

 

Material Specification:

 

16mm Trespa Athlon was used in the Science Laboratories, Food Technology Rooms as well as Design Technology rooms, all supplied by Performance Panels Ltd.

 

Technical Specification:

 

Each Laboratory incorporated a bespoke teacher’s demonstration bench with gas, electric, water & fume cupboard docking stations as well as student service bollards which include gas and electrical outlets. Perimeter benches incorporated both epoxy resin and Belfast sinks with both hot & cold supply.

Food Technology perimeter and perimeter benches included cut-outs for gas & electric hobs as well as sinks.